Under this project it is planned to construct more than 40km highway with the large amount of bridges and tunnels. At the same time the recostruction of the railway from Sochi to Veseloe stations is perfromed, including construction of the second railway and the M-27 road with junctions.

The artificial structures over the railways include the following:

  • railway overpass of the ramp 2 on the road from Adler to Alpika-Service

This overpass is 830m-long. It crosses the railways and the M-27 highway. 

  • railway overpasses of the ramp 1 and ramp 2 on the road from Alpika-Service to Imeretinsky resort
  • railway bridge across the Mzymta River on the road from Adler to Alpika-Service

Type of works done: detailed design